Monthly Archive: September, 2013

Floor and ceiling panels are in Kevan finally!!

There are four days left until my sister arrives to stay in Kevan.  Last post I gave up trying to get the painting done before she comes, so I have now put the… Continue reading

Days 12 and 13 Campervan Conversion Leave: Painting Pt 2, Priority Reassessment

So, I screwed up the metal bar-ish thing that I painted in the last post. I had done a first coat of black paint, undiluted as an experiment, the result (when it was… Continue reading

Days 10 and 11 Campervan Conversion Leave: First Painting Done (YAY!) and Ceiling Insulation Complete

I painted something!!!  My girlfriend was very encouraging and told me to just do it, so I picked something that was going to be 100% hidden, and had a go.  This seems to… Continue reading

Days 4 to 9 Campervan Conversion Leave: Too busy to blog

It’s the evening of day 9.  I’d like to say that it is because I was working hard from dawn ’til dusk that I didn’t have time to blog until now.  That’s only… Continue reading

Days 2 and 3 Campervan Conversion Leave: A bit of everything to procrastinate painting, and a successful curtain header!

I have suffered a grievous spray-adhesive injury.  After spraying ’til I could spray no more with my right hand on the morning of day 2, I sprayed ’til I could spray no more… Continue reading

Day 1 Campervan Conversion Leave: Garage Cleanup, Towbar Removal, Ceiling Panel Covering part 2 and Ceiling Insulation part 1

Day one of my two weeks of ‘Campervan Conversion Leave’.  Today I tidied up, vacuumed and dusted the garage in preparation for doing gluing and painting which needs a clean workspace (no pics… Continue reading